RADIOREADY
FCC approval workbench · v1.0.0
Saved locally
Define · Product baseline

Start with the actual device.

Capture the production-intent configuration and every RF function. RADIOREADY turns those facts into a traceable preliminary strategy—not a magic approval answer.

Planning aid only. Confirm the final path with an FCC-recognized accredited laboratory, TCB, or qualified regulatory professional.

Identity

Functions

Use and distribution

Configuration identity

Define · Classification

Authorization matrix

Each row is a separate obligation. Record the rule, procedure, rationale, and confidence.

Working matrix

FunctionRule / procedureStatusConfidenceRationale
Define · Transmitter inventory

Modules and custom transmitters

A module grant is a constrained design input. The host still needs integration, Part 15B, labeling, and exposure review.

Transmitters

Name / FCC IDTechnology / bandsAntennaGrantStatus
Prepare · Configuration control

Representative test configuration

Physical

Operating

Frozen baseline

Prepare · Technical file

Documents and labeling

Document register

DocumentRequired forStatusLocation

Product label

User statements

Prepare · RF exposure

RF exposure record

Evaluation

Evidence

Prove · Test campaign

Tests and evaluations

Campaign register

TestProcedure / configurationStatusResultReport
Prove · Traceability

Evidence, assumptions, and findings

Evidence

Assumptions

Findings

Prove · Post-test control

Configuration change review

Change log

ChangeAreaRiskDispositionEvidence
Release · Filing and grant

Authorization record

Certification / TCB

Supplier’s Declaration

RADIOREADY FCC Readiness Packet

Generated with RADIOREADY v1.0.0

Release · Decision record

Release gate

Approval decision

Reference shelf

Rules and boundaries

Limits

RADIOREADY organizes facts and evidence. It does not measure emissions, calculate every limit, file an application, issue an FCC ID, replace a TCB or laboratory, or provide legal advice.

Release history

v0.1 intake · v0.2 classification · v0.3 laboratory preparation · v0.4 documents · v0.5 testing · v0.6 RF exposure · v0.7 change control · v0.8 authorization · v0.9 release readiness · v1.0 complete workflow.

Fresh Start?

This clears the locally saved project. Export first if needed.